Free DuPont Schedule Generator with Pay & Overtime Calculator
Build Rotating Shift Calendars + See Your Gross Pay Per Period - DuPont, Pitman, 4-on-4-off & More
Generate printable rotating shift schedules for manufacturing plants, refineries, hospitals, warehouses, and any 24/7 operation. Supports DuPont, Pitman 2-2-3, 4-on-4-off, Continental 8-hour, 4x10 compressed, and 9/80 biweekly patterns. Enter your anchor date, pick your rotation pattern, customize crew names and colors, then download a clean color-coded PDF calendar with one click. Built-in pay estimator calculates gross earnings per pay period with overtime tracking - enter your hourly rate and see exactly what each rotation pays. The PDF export creates print-ready schedules you can post in break rooms, email to supervisors, or archive for records. Free, browser-based, no signup required.
Visualize multi-crew coverage and identify handoff gaps
Crew Rotation Visualizer →Calculate overtime pay and shift differentials for any rotation pattern
Overtime Pay Calculator →Assess fatigue risk from consecutive 12-hour shifts and night rotations
Fatigue Risk Calculator →Determine how many workers you need per shift for full coverage
Headcount Coverage Planner →How It Works
-
Select Your Rotation Pattern
Choose from DuPont (28-day cycle), Pitman 2-2-3 (14-day), 4-on-4-off (8-day), Continental (21-day), 4x10 compressed, or 9/80 biweekly. Each pattern shows crew count, shift length, and average weekly hours.
-
Set Your Date Range & Anchor Date
Pick a start and end date for the calendar. Set the anchor date to align the pattern with your facility's current rotation. This is the date your "Day 1" of the cycle falls on.
-
Customize Crew Colors & Labels
Assign names and colors to each crew (A, B, C, D). Color-coding makes it easy to spot who's on day shift, night shift, or off at a glance.
-
Preview the Calendar
Review the generated calendar month by month. Check that your anchor date lines up correctly and that days-off fall where expected before printing.
-
Download PDF or Print
Export your color-coded schedule as a clean, professionally formatted PDF with one click. The PDF includes month headers, crew color legend, and is sized for standard letter paper. Post it in break rooms, email it to supervisors, hand it out during crew briefings, or archive it for scheduling records. You can also use your browser's print function for quick hard copies.
Built For
- Manufacturing plants running 24/7 production lines with 4-crew DuPont or Pitman rotations
- Oil refineries and chemical plants coordinating 12-hour rotating shifts across operations crews
- Paper mills and steel mills managing continuous process operations with 28-day rotation cycles
- Hospitals and nursing facilities scheduling 12-hour nursing shifts on a 2-2-3 Pitman pattern
- Warehouses and distribution centers running overnight fulfillment with 4-on-4-off schedules
- Power plants and utilities coordinating control room coverage with Continental 8-hour rotations
- Public safety dispatch centers and 911 operations with 9/80 compressed schedules
Features & Capabilities
DuPont 28-Day Pattern
12-hour shifts across 4 crews with a 28-day cycle. The industry standard for continuous operations. Each crew gets a 7-day break every 28 days, averaging 42 hours per week.
Pitman 2-2-3 Pattern
14-day rotation using 12-hour shifts with 4 crews for full 24/7 coverage. The "2-2-3" refers to the on/off pattern: 2 days on, 2 days off, 3 days on, then reverse. Also called the "every other weekend off" schedule. Popular in healthcare and public safety.
4-on-4-off Pattern
8-day repeating cycle with 12-hour shifts. Simple and predictable - work 4 days, off 4 days. Requires 4 crews for 24/7 coverage. Common in mining, corrections, and security.
Continental 8-Hour Pattern
21-day cycle using traditional 8-hour day, swing, and night shifts across 4 crews. Lower fatigue than 12-hour patterns. Widely used in European manufacturing and some US plants.
4x10 Compressed Workweek
Four 10-hour shifts per week with 3 consecutive days off. Not a 24/7 pattern, but popular for maintenance crews, shops, and operations that don't run weekends.
9/80 Biweekly Schedule
Work 80 hours over 9 days across a 2-week period, earning every other Friday off. Common in engineering, government, and salaried industrial roles where compressed time is negotiated.
Pay & Overtime Estimator
Enter your hourly rate and see gross earnings per pay period for any rotation pattern. The calculator tracks regular hours vs overtime, handles weekly and biweekly pay periods, and lets you override individual days as OT. Know exactly what each rotation pays before you pick up a shift or bid on a new schedule.
ICS Calendar Export
Export your rotation schedule as an ICS calendar file that imports directly into Google Calendar, Outlook, or Apple Calendar. Each shift shows up as a calendar event with shift type and times. Share with your crew so everyone has the schedule on their phone.
Comparison
| Pattern | Cycle Length | Shift Length | Crews Required | Best For |
|---|---|---|---|---|
| DuPont | 28 days | 12 hours | 4 crews | Continuous manufacturing, refineries |
| Pitman 2-2-3 | 14 days | 12 hours | 4 crews | Hospitals, public safety, smaller ops |
| 4-on-4-off | 8 days | 12 hours | 4 crews | Mining, corrections, security |
| Continental | 21 days | 8 hours | 4 crews | European-style mfg, lower fatigue needs |
| 4x10 Compressed | 7 days | 10 hours | 1 crew | Maintenance shops, non-24/7 operations |
| 9/80 Biweekly | 14 days | 8-9 hours | 1 crew | Engineering, government, salaried staff |
Frequently Asked Questions
Learn More
Choosing the Right Rotating Shift Schedule
DuPont, Pitman, Continental, 4-on-4-off - what makes each pattern different, how crew count drives the decision, fatigue tradeoffs, and how to plan a transition.
Fleet PM Cost Planning: In-House vs Outsourced Maintenance
How to plan fleet preventive maintenance budgets. PM intervals by vehicle class, cost comparison for in-house vs outsourced maintenance, and total cost analysis.
Shift Fatigue Risk Assessment for Plant Workers
How to assess fatigue risk using Folkard-Lombardi scoring, regulatory limits from API RP 755 and FMCSA, and strategies to mitigate shift fatigue.
How to Calculate 24/7 Staffing Requirements
Relief factor analysis for continuous operations. DuPont, Pitman, and Panama rotation schedules with PTO, sick leave, and training allowances.
Understanding Shift Differential Pay
How shift differential premiums work, flat-dollar vs percentage methods, industry benchmarks, and annual cost projections for night and weekend shifts.
Related Tools
Local SEO Foundry
Plan and track your local SEO strategy. Manage business citations, review profiles, NAP consistency, and Google Business Profile optimization for contractors and local service businesses.
DIY Project Plan Builder
Step-by-step build plans for mini-split installs, generator setups, shop heaters, outbuilding wiring, and water heater replacements. Get sized tool and material lists based on your calculator results.
Crew Rotation Visualizer
See all crews on one timeline. Visualize multi-crew shift coverage across days, weeks, and months. Spot handoff gaps, compare rotation patterns, export PDF timelines, and download ICS calendar files. Built for operations managers and plant schedulers.